Steel Stock Racking & Trolleys
Cantilever racks for 6 m lengths · plate rack · 2 t trolleys
Keeps sections, tubes and plate sorted by grade and size for fast picking.
11 line items in process order, each with its tag, specification, quantity, power and an indicative unit price.
Cantilever racks for 6 m lengths · plate rack · 2 t trolleys
Keeps sections, tubes and plate sorted by grade and size for fast picking.
3 t SWL · 10 m span · electric hoist, pendant control
Lifts beams and finished assemblies safely between work stations.
250 mm round capacity · mitre 0–60° · coolant pump
Cuts sections, tubes and bar to length with square or mitred ends.
Hypertherm 65 A · 1,500 × 3,000 mm bed · nesting software
Profiles plate and sheet from DXF drawings: base plates, gussets, gate panels.
32 mm drilling capacity · geared head · magnetic vice
Drills bolt holes in plates, flats and sections to drawing.
63 t × 2,500 mm · NC back gauge · segmented tooling
Bends sheet and plate into channels, brackets, cabinets and furniture parts.
350 A inverter · 4-roll wire feeder · welding table + screens
Semi-automatic welding for frames, trusses, gates and furniture.
Mobile · HEPA cartridge · 3 m arm
Captures welding fume at source to protect welders' lungs.
115 & 230 mm grinders · clamps · measuring tools
Weld dressing, deburring and fit-up at every bench.
6 × 4 × 3 m · dry filter exhaust · explosion-proof lights
Primes and top-coats finished work in a ventilated, fire-safe enclosure.
200 L receiver · 10 HP · 8 bar · filter-regulator
Air for the spray guns, plasma torch and pneumatic tools.
Indicative ex-works prices (US$, 2026) for budgeting a sample project, not quotations. Photos are illustrative of each machine class.
9 unit operations in order, with the equipment that performs each and its control point.
| Step | Operation | Equipment | Control point |
|---|---|---|---|
| 01 | Receive & store steelSections and plate are checked against mill certificates and racked by grade. | MH-101 Steel Stock Racking & TrolleysCR-101 Overhead Gantry Crane |
Mill cert · heat number logged |
| 02 | Mark & saw-cutMembers are marked from the cutting list and cut to length or mitre.Offcuts → scrap bin | BS-201 Horizontal Metal Band Saw |
Length ± 1 mm |
| 03 | CNC plasma profilingPlates and gate panels are nested and cut from DXF files. | PL-201 CNC Plasma Cutting Table |
First-off check against drawing |
| 04 | Drill & punchBolt holes are drilled to the connection details. | DP-202 Column Drill Press |
Hole position ± 0.5 mm |
| 05 | Bend & formSheet and plate are bent into channels, brackets and furniture parts. | PB-203 Hydraulic Press Brake |
Bend angle ± 0.5° |
| 06 | Fit-up & weldParts are jigged, tacked, checked for square and fully welded. | WD-301 MIG Welding StationFX-301 Welding Fume Extractor |
Visual weld inspection · square/diagonal check |
| 07 | Grind & finishWelds are dressed, edges deburred and spatter removed. | GR-302 Angle Grinders & Hand Tool Sets |
Surface free of spatter and sharp edges |
| 08 | Prime & paintWork is degreased, primed and top-coated in the booth. | PT-401 Spray Paint BoothAC-401 Piston Air Compressor |
Dry film thickness 80–120 µm |
| 09 | Inspect & dispatchFinal dimensional check, marking and loading for delivery. | CR-101 Overhead Gantry Crane |
QC sign-off · delivery note |
6 zones arranged for one-way material flow, with every item of equipment placed by tag.
Plasma profiling from DXF files gives repeatable parts with no manual marking.
A 3-ton gantry crane moves beams and assemblies without forklifts inside.
Screened MIG bays let four welders work in parallel on different jobs.
Fume extraction at source and a filtered paint booth protect the team.
Steel moves from stock to dispatch without crossing back through the shop.
Hot work and painting are separated, with extinguishers every 3 m at welding stations.
The core routines operators follow, from start-up to batch release.
11 sections: open any one to read it, or download the whole document.
IronWorks Kenya is a steel fabrication workshop in Nairobi's Industrial Area specializing in structural steelwork, gates and grilles, metal furniture, and custom fabrication for the construction and real estate sectors.
| Metric | Value |
|---|---|
| Workshop Size | 5,000 sq ft |
| Initial Investment | KES 8,500,000 (~$65,000) |
| Year 1 Revenue | KES 18,000,000 |
| Year 3 Revenue | KES 42,000,000 |
| Gross Margin | 35-42% |
| Product Line | Description | Avg. Order Value | Monthly Volume |
|---|---|---|---|
| Structural Steel | Beams, columns, trusses for buildings | KES 500,000 | 3-5 projects |
| Gates & Grilles | Security gates, window grilles, railings | KES 80,000 | 20-30 units |
| Metal Furniture | Tables, shelving, display units | KES 35,000 | 30-50 units |
| Custom Fabrication | Signage, tanks, containers, special projects | KES 150,000 | 5-8 projects |
| Repair & Maintenance | Welding repairs, modifications | KES 15,000 | 40-60 jobs |
| Equipment | Specification | Cost (KES) |
|---|---|---|
| MIG Welding Machines | Lincoln Electric 350A (x4) | 800,000 |
| Plasma Cutter | Hypertherm 65A CNC table | 1,200,000 |
| Hydraulic Press Brake | 63-ton, 2500mm | 900,000 |
| Band Saw | Horizontal, 250mm capacity | 250,000 |
| Drill Press | Column drill, 32mm capacity | 120,000 |
| Angle Grinders & Hand Tools | Various (10 sets) | 200,000 |
| Overhead Crane | 3-ton gantry crane | 450,000 |
| Compressor | 200L, 10HP | 150,000 |
| Paint Booth | Spray booth with exhaust | 300,000 |
| Metric | Year 1 | Year 2 | Year 3 |
|---|---|---|---|
| Revenue | 18,000,000 | 28,000,000 | 42,000,000 |
| Material Costs (45%) | 8,100,000 | 12,600,000 | 18,900,000 |
| Labor | 3,600,000 | 5,040,000 | 7,560,000 |
| Overheads | 2,400,000 | 3,200,000 | 4,200,000 |
| Net Profit | 3,900,000 | 7,160,000 | 11,340,000 |
| Net Margin | 22% | 26% | 27% |
Kenya's construction sector grew 6.1% in 2025 with major projects including the Nairobi Expressway extension, BRT Phase 2 and over 18,000 affordable-housing units commissioned annually. Demand for structural steel, security gates and metal fittings has outpaced supply, with most large fabricators booked 4-6 weeks ahead.
| Tier | Definition | Value (KES) |
|---|---|---|
| TAM | Kenya structural & architectural steel fabrication | 78 billion |
| SAM | Nairobi metro construction + housing | 32 billion |
| SOM (Year 3) | IronWorks at 0.13% of SAM | 42 million |
| Competitor | Strength | Weakness |
|---|---|---|
| Mabati Rolling Mills | Brand + scale | Roofing focus, slow on custom orders |
| Devki Steel | Raw material integration | Limited custom fabrication |
| Local backyard welders | Low cost | Inconsistent quality, no warranty |
IronWorks differentiation: Mid-tier price, certified welders, 14-day turnaround on custom orders, and a 12-month structural warranty.
| Channel | % Revenue | Customer |
|---|---|---|
| Direct B2B (Contractors) | 50% | Construction firms, engineering consultants |
| Real Estate Developers | 20% | Apartment block developers, mixed-use projects |
| Architect / Designer Referrals | 15% | Custom gates, railings, signature pieces |
| Retail Walk-in (showroom) | 10% | Homeowners, small businesses |
| Online (website + WhatsApp Business) | 5% | Direct enquiries, repair jobs |
| Certification | Authority | Status | Renewal |
|---|---|---|---|
| NCA Class 5 Registration | National Construction Authority | To obtain (M2) | Annual |
| KEBS Welder Certification | Kenya Bureau of Standards | 3 welders certified at launch | 2-yearly per welder |
| OSHA Workplace Compliance | DOSHS | Continuous | Annual audit |
| NEMA Effluent Licence | NEMA | To obtain (M3) | Annual |
| County Trade Licence | Nairobi County | Annual | Annual |
| Role | Headcount | Monthly (KES) |
|---|---|---|
| Workshop Manager / Owner | 1 | 120,000 |
| Project Engineer (CAD + estimation) | 1 | 90,000 |
| Foreman | 1 | 65,000 |
| Certified Welders | 4 | 40,000 each |
| Fitters / Fabricators | 4 | 28,000 each |
| Painter / Finisher | 1 | 30,000 |
| Driver / Site Installer | 2 | 25,000 each |
| Sales & Quotation Officer | 1 | 55,000 |
| Bookkeeper (part-time) | 1 | 30,000 |
| Total | 16 | ~720,000 |
Skills development: Quarterly internal training on TIG welding, plasma operation, and structural blueprint reading. Two apprenticeship slots per year sourced from Kabete Technical Training Institute.
| Month | Milestone |
|---|---|
| M1 | Workshop lease signed (5,000 sq ft, Industrial Area) |
| M2 | NCA Class 5 application; equipment ordered; 3-phase power upgrade |
| M3 | Plasma cutter + press brake installed and commissioned |
| M4 | Pilot project: 4 batches of security gates for soft launch |
| M5 | First structural project (commercial warehouse trusses, ~KES 2M) |
| M6 | Showroom + Instagram launch; 3 architect partnerships signed |
| M9 | Hire 2 additional welders; reach monthly revenue KES 1.5M |
| M12 | Year 1 close: KES 18M revenue, 30+ completed projects |
| M18 | Second shift (evening) added; expand product line to staircases |
| M24 | Open satellite workshop in Mombasa (coastal demand) |
| Risk | Likelihood | Impact | Mitigation |
|---|---|---|---|
| Steel price spike (global volatility) | High | High | Quote validity capped at 14 days; bulk purchase of high-runner profiles |
| Workplace injury (welding, lifting) | Medium | High | Mandatory PPE, weekly safety briefings, WIBA insurance, first-aid-certified foreman |
| Project payment delays | High | Medium | 40/40/20 progress payments; legal recourse via SCAC; small-claims for < KES 1M |
| Power outages disrupting CNC jobs | Medium | Medium | 30 kVA standby generator + UPS on CNC controllers |
| Skilled welder turnover | Medium | Medium | Performance bonuses + cross-training so any 2 welders can backstop critical jobs |
| Cheap import competition | Medium | Low | Position on quality + warranty + service; not competing on lowest price |
Total Ask: KES 8,500,000 (~$65,000) — founder equity KES 4M + asset-financing KES 4.5M (5-year term, prime + 3%).
| Category | Amount (KES) | % |
|---|---|---|
| Major equipment (MIG, plasma, press brake, crane) | 4,370,000 | 51% |
| Workshop fit-out + 3-phase power | 1,400,000 | 16% |
| Vehicles (1-ton pickup + delivery truck) | 1,500,000 | 18% |
| Initial raw material stock (10 tonnes) | 800,000 | 9% |
| Working capital + certifications | 430,000 | 5% |
Year-3 return: Net profit KES 11.34M against equity of KES 4M = 2.8x cash-on-cash; expected investor IRR ~38% over 5 years.
Equipment specifications, process flow diagrams, recipes and the business plan, bundled as one download.
We use strictly necessary cookies to sign you in and keep the site secure. With your consent we also use functional and analytics cookies to remember your preferences and understand which features get used. We do not use advertising cookies. Read our Cookie Policy.
Declining does not limit any paid feature. Change your choice any time via "Cookie Settings" in the footer.